BioGAP - Biogas and Ash Processing

Funding:

This project is funded by the Climate and Energy Fund and processed by the FFG within the program “NEUE ENERGIEN 2020” (FFG Project Number 834424)


Neue Energien 2020_LogoFFG_logo


Funding period: 04/2012 – 09/2014


Synopsis:


Ash from biomass combustion (wood ash, bark ash) has a potential for fixation of CO2 and H2S. The capacity of biomass ash for CO2 and H2S-fixation and the suitability of ash for upgrading of biogas are investigated in the present project (laboratory scale, larger scale at one biogas plant). As an output from the innovative upgrading process, carbonated ash which is expected to be unproblematic for utilisation is produced.

The Institute for Infrastructure is involved in the design and construction of the biogas upgrading facility. It furthermore conducst gas monitoring of the plant to determine the efficieny of the system.


Partner:

  • Institute of Waste Management, University of Natural Resources and Life Science Vienna (Coordinator)
  • Institute for Microbiology, University of Innsbruck
  • Institute for Infrastructure, University of Innsbruck
  • Biogas plant Armin Hofer
  • Josef Hautz


Contact:

University Innsbruck
Univ.-Prof. Dr.-Ing. Anke Bockreis
Institute of Infrastructure, Unite of Environmental Engineering
Technikerstrasse 13
6020 Innsbruck
waste@uibk.ac.at