|
The results of the work package are summarised in a folder on "Managing Alpine Land Resources – Regional development instruments":
download English version
download Slovene version
download French version
download German version
download Italian version
The final WP9 report is available in English: download pdf-File |
Objectives |
Drawing on the results of WP5-8 and taking into account the different implementation procedures in the Alpine countries, this WP will:
· provide an overview of instruments supporting regional progress
· and elaborate proposals for tools facilitating transnational regional development. |
Main activities |
· Overview of instruments supporting sustainable regional development in the specific sector
· Identification of promoting and hindering conditions for the implementation of regional development tools (see WP5)
· Selection of suitable indicators (see WP7 and 8)
· Proposals for improvement of existing or elaboration of new steering tools for the selected sector
· Optimisation of the tools integrating the results of the stakeholder workshops (see WP10 and 11)
· Compilation of reports |
Tasks of WP leader |
Compilation of an overview of indicator based and qualitative instruments supporting sustainable regional development in the specific sector determined in WP6; identification of promoting and hindering conditions which influence the work with development instruments in the selected sector taking into account the different planning milieus in the cultural regions (see WP5); selection of suitable indicators considering the significance of the different driving forces (see WP7) and availability of the data (see WP8); proposals for improvement of existing or elaboration of new steering tools for the selected sector; optimisation of the instruments, integrating the results of the stakeholder workshops (see WP10 and 11); compilation of internal and external reports |
Tasks of other partners |
Contribution to the overview of instruments, the promoting and hindering conditions in their countries and the selection of suitable indicators
|
Outputs |
1 report and 1 contribution to the DIAMONT information platform providing proposals for indicator based regional development tools for the sector determined in WP6 |
Expected results |
· Improved indicator based regional development capacities and tools in six Alpine regions
· Formulation and dissemination of guidelines with indications for use of indicators in transnational compatible regional development activities in the Alpine arc |